Blue=Edwards Roofing
INVOICE:
Tuesday – January 3rd, 2017 – Did
the following work:
·
Removed
the Christmas decorations at the entrance to the complex
·
Installed
new house number at 3223 Sandpiper North drive
·
3090
South Drive
Ø
Touched
up paint on the trim and siding installed last week
·
9539
& 9556 Sandpiper East Drive
Ø
Raked and
bagged leaves at these addresses
Wednesday – January 4th,
2017 – Did the following work:
·
Continued
raking and bagging leaves at the following addresses:
Ø
9560 East
Drive
Ø
Behind
3090 South Drive
·
Took
truck load of bags from yesterday and today to Rays trash
Thursday – January 5th,
2017 – Did the following work:
·
Put ice
melt down at the entrance and curves
·
Met
homeowners at 9522 Sandpiper East drive to survey building for repairs and make
list of work to be done.
Ø
Made list
of materials on hand in pool house storage area
Friday – January 6th,
2017 – Did the following work:
·
Put down
additional ice melt on the entrance and in front of mailboxes
·
Surveyed
the complex and picked limbs in yards
Monday – January 9th, 2017 – Did
the following work:
·
9522
Sandpiper East Drive
Ø
Replaced
the pie shaped end of soffit on this unit
Ø
Counted
the amount of siding and trim needed to make repairs on the end of this
building and unit.
-
Ordered
the materials to make repairs
Tuesday – January 10th,
2017 – Did the following work:
·
Made a
good trash pick up across the front and through out the complex
·
Cleaned
storm drains
·
Piled up
limbs through out the complex and loaded on the truck for disposal
·
Took
truck load of debris to Rays
Wednesday – January
11th, 2017 – Did the following work:
·
Picked up
paint and paint supplies from Sherwin Williams
·
Picked up
truck load of siding from Menards
·
Painted
siding at the pool house in prep for use next week
·
3090
& 3094 Sandpiper South Drive
Ø
Reinstalled
downspouts blown off the buildings
Ø
Also did
“2” others not called in
Thursday – January 12th,
2017 – Did the following work:
·
Picked up
trim from Menards
·
Painted
in prep along with the siding painted earlier next week
Friday – January 13th,
2017 – Did the following work:
·
Put down ice
melt on the entrance and curves through out the community in prep for freezing
rain over the weekend.
Monday – January 16th,
2017 – Did the following work:
·
Picked up
insulation board at Menards and deliver to the complex for use later this week.
·
Made a
good trash pick up across the front and through out the complex
·
Picked up
full truck load of limbs through out the complex and hauled to Rays
trash
Wednesday – January
18th, 2017 – Did the following work:
·
9522 East
Drive – North End of building
Ø
Removed
lower section of siding and half of the 2nd level
Ø
Repaired
insulation board
Ø
Installed
10 sheets of siding and trimmed out the bottom and corners
Ø
Caulked
new trim and siding joints
Ø
Touched
up the paint
Ø
Took a
truck load of debris to Rays trash
Thursday – January 19th,
2017 – Did the following work:
·
9522 East
Drive
Ø
Picked up
additional trim from Menards
Ø
Took to
the pool house and painted in prep for use
·
9522 East
Drive – North End of building
Ø
Removed
the remaining half siding of siding from the 2nd level and all of
the siding from the 3rd upper level.
Ø
Repaired
insulation board as needed
Ø
Installed
new siding on the 2nd and 3rd level
Ø
Installed
new trim and caulked
Ø
Removed
and replaced all the wood on the north bay window
Ø
Touched
up nail heads and caulk
Ø
Took a
truck load of debris to Rays trash
Ø
Friday –
January 20th, 2017 – Did the following work:
·
Picked up
additional “smart trim” and “drip cap” to be used on siding repairs next week.
Stored at the pool house
·
9522 East
Drive
Ø
Removed
the rotted sections of siding on the back siding of the chimney and replaced.
Ø
Caulked
Ø
Stacked
up scrap to be removed later
Saturday – January 21st,
2017 – Did the following work:
·
Painted
the trim delivered yesterday in prep for use next week
January 19th, 2017
·
Assisted PSG personnel with replacement of siding on the
north end of building #11.
Ø
Removed siding and related trim from the 1st
and half of the 2nd level of the 3 story high building.
Ø
Repair the insulation board behind the siding
Ø
Installed 8 pcs of siding, new drip cap, trimmed and
caulked
January 20th, 2017
·
Assisted PSG personnel with completion of the siding on
the north end of building #11.
Ø
Removed the remained of the siding from the 2nd
level and all of the 3rd level and related trim
Ø
Repaired and replaced the insulation board as needed
Ø
Installed 1x12 band boards and drip cap on 2nd
and 3rd level
Ø
Installed remaining siding on the 2nd level
and all the siding on the 3rd story level
Ø
Trimmed out and caulked
January 21st, 2017
·
Assisted Larry with removal of siding and trim from the 2nd
and 3rd level on the back of the chimney at 9522 East drive.
Installed new siding and trim.
Monday – January 23rd,
2017 – Did the following work:
·
Picked up
paint and paint supplies at Sherwin Williams
Ø
Picked up
12 pcs of siding and trim at Menards
Ø
Painted
siding and trim in prep for use next week
·
9522 East
Drive
Ø
Screwed
supports on deck
Ø
Surveyed
remainder of decks on building #11 and secured supports with screws
·
Loaded up
lumber generated by the contractors working on the chimney last week and took
to Rays along with trash from the pool area
Thursday – January 26th,
2017 – Did the following work:
·
Investigated
abandoned vent on side of building that was open and causing cold are to get
into the unit
·
Removed
36” long section of 1x12 belt boards, cut and installed new section and caulked
Friday – January 27th,
2017 – Did the following work:
·
Put down
ice melt at the entrance
Wednesday – February
1st, 2017 – Did the following work:
·
Picked up
“6” 1x12 boards at Menards
·
Picked up
paint at Sherwin Williams
Ø
Transported
the lumber to the pool house and painted in prep for installation next week
·
Painted
new lumber where Larry made a repair on the end of the building last week.
Wednesday – February
8th, 2017 – Did the following work:
·
Made a
good trash pick up across the front of the complex
·
Put down
ice melt in prep for the snow and ice storm
Thursday – February 9th,
2017 – Did the following work:
·
Retreated
the front entrance and intersection of the complex
·
Larry
made a complete building inspection on all buildings on the South and East,
took pictures and made list of repairs and materials needed for the 2017 years
repairs.
Friday – February 10th,
2017 – Did the following work:
·
Picked up
materials at Reese and Menards
·
9536 East
Drive – South 3 story end of building
Ø
Removed
all trim from 2st and 2nd story of building
Ø
Removed 4
lower 4x8ft sheets of siding from the lower level, 8 from the 2nd
level and 8 1ft high pcs between the 2nd and 3rd level
Ø
Repaired damaged
area of insulation board behind the siding
Ø
Installed
“12” pcs of pre-painted T1-11 siding on the 1st and 2nd
levels
Ø
Installed
new drip cap and 64ft of 1x12 smart trim between the 1st, 2nd
and levels of sidng.
Ø
Installed
1x6 trim across the bottom and up both sides
Ø
Caulked
with “Geocel “ sealant
Ø
Hauled a
full truck load of scrap to Rays trash
February 11th, 2017-
Ø
Assisted PSG crew with removal of siding & trim from
the 1st and 2nd story of 9536 East Dive and the
installation of the new siding and trim.
Wednesday – February
15th, 2017 – Did the following work:
·
Picked up
paint and paint supplies at Sherwin Williams
·
Picked up
a load of trim lumber at Menards
Ø
Painted
the trim lumber in prep for building repairs later in the week.
·
9474
Sandpiper East Drive
Ø
Caulked,
filled nail holes and painted trim and siding installed earlier
·
Building
#12 – 9536 East
Ø
Touched
up the paint on the new siding and trim installed last week
Thursday – February
16th, 2017 – Did the following work:
·
Picked up
“20” sheets of siding and 20 sticks of siding drip cap at Menards
·
Transported
to the complex
·
Painted
the siding in prep for installation over the next two weeks.
·
Put down
grass seed on yards between buildings 11 & 12 where we have been doing
repairs.
Ø
Also
surveyed complex for areas damaged by snow plowing and seeded.
Friday – February 17th,
2017 – Did the following work:
·
Removed
the remainder of the trim and siding from the 2nd and 3rd
story level of the South end of building #12.
Ø
Repair
and replaced the insulation board as needed
Ø
Installed
new siding and trim where the old was removed
Ø
Replaced
the rake boards on the peak of the building.
Ø
Replaced
the 1x4 and 1x6 trim where the siding meets the lower roof shingles across the
full length of the east side of the building
Ø
Caulked all
the new trim and siding with Geocel sealant
·
Loaded
the scrap and topped off the truck with piles of limbs from through out the
community
·
Hauled a
truck loads of scrap to Rays trash
February 17th, 2017
Assisted PSG crew with removal of siding & trim from
the 3rd level story of 9536 East
·
Also replaced the 1x4 and 1x6 cedar trim where the siding
meets lower roof across the east side of all “6” building units.
February 18th, 2017
Building #11 – 9522 East Drive - Replaced
leaking siding and trim behind and on the sides of the chimney and
re-flashed.
Monday – February 20th,
2017 – Did the following work:
·
Picked up
1x4 & 1x6 Smart trim at Menards
·
Picked up
Gray paint and paint supplies at Sherwin Williams
·
Painted
24 pcs trim at the pool house in prep for use on Tuesday
Tuesday – February 21st,
2017 – Did the following work:
·
9560 East
Drive (North end of building #12)
Ø
Removed
“10” pcs of siding and related trim on the north end of building #12.
Ø
Replaced
water damaged rotted 2x4s and insulation board.
Ø
Installed
“10” pcs of new siding
Ø
Trimmed
around the glass bay window
Ø
Installed
1x6 across the base of the wall
Ø
Removed
the rotted 1x6 cedar from the 3rd story peak rake. Replaced the rake
board with 1x6 “Smart Trim” and repaired the boxed end eve boxes
Ø
Caulked
all the new trim with Geocel sealant
Ø
Hauled a
truck load of scrap from the repairs to Rays
Wednesday – February
22nd, 2017 – Did the following:
·
Picked up
10 pcs of T1-11 12” OC siding at Menards
Ø
Painted
at the pool house in prep for use today
·
9556 East
Drive
Ø
Removed
rotted siding and trim over garage peak
Ø
Installed
2 pcs siding and related trim
Ø
Caulked
with geocel sealant
Ø
Met
homeowner at this unit and looked at the damaged garage door.
·
9552 East
Drive
Ø
Removed
rotted siding and trim from over the garage peak
Ø
Installed
2 pcs siding and related trim
Ø
Caulked
with geocel sealant
·
9540 East
Drive
Ø
Removed
the buckled trim along the side of the North side of the garage.
Ø
Screwed
down the existing metal drip cap so water would run off properly.
Ø
Installed
a wood 1x4 drip cap and 1x4 trim, screwed to the “Hardi-Board” siding and
sealed with Geocel sealant.
·
Took a
truck load of scrap to Rays
February 22nd, 2017
Assisted PSG crew with removal of siding and trim on the
end of building #12 and replacement.
Thursday – February 23rd,
2017 – Did the following work:
·
7540 East
Drive
Ø
Cut and
installed short section of trim on soffit over the garage
Ø
Reattached
the gutter and downspout next to the chimney on the 2nd story roof
in back.
Ø
Painted
the trim installed on the garage yesterday
·
9552
& 9556 East Drive
Ø
Touched
up the paint on the siding installed yesterday
·
Picked up
the up the snow stakes, bundled and stored for the season.
Monday – March 6th,
2017 – Did the following work:
·
Cleaned
up limbs blown down in last weeks heavy winds
·
Load up
truck and hauled to Rays
Tuesday – March 7th,
2017 – Did the following work:
·
Cut up
large section of tree that fell behind 3091 North Drive
Ø
Stacked
up the large section of tree for homeowners to use as fire wood
Ø
Loaded up
the remainder of the tree on the truck along with limbs that would not fit on
the truck yesterday
·
Purchased
light fixtures at Menards
·
Replaced
ceiling light fixtures as follows:
Ø
Ceiling
light in the pump room – Fixture and wiring completely eaten up by chlorine
gas.
Ø
Replaced
“2” fixtures under the canopy
Ø
Replaced
“2” ceiling fixtures in the storage room
Ø
Replaced
bulbs in the restroom lights
·
9462 East
Ø
Reinstalled
blown off fence slats
·
3181
North
Ø
Looked at
damaged brick and leaking drier vent
Friday – March 9th,
2017 – Did the following work:
·
3113
North
Ø
Refastened
downspout on roof
·
9466
& 9470 East Drive
Ø
Removed
rotted siding and trim over garage door
Ø
Installed
new siding and trim
Ø
Caulked
Ø
Hauled
away scrap
Monday – March 13th,
2017 – Did the following work:
·
Put down
ice melt at the entrance to the complex
Friday – March 17th,
2017 – Did the following work:
·
Unstopped
the lower front gutters on units with River Birch trees on South and East
Drives.
Ø
Also
removed limbs from the roofs and gutters
Friday – March 24th,
2017 – Did the following work:
·
Met
homeowners at 3181 Sandpiper North drive to investigate a persistent leak.
Ø
Got in
attic to look for possible roof leak from inside.
Ø
Found
bath exhaust duct leaking in attic
Ø
Told
homeowner this would be theirs to repair and gave suggestions or repair methods
March 23rd , 2017
Performed the following work at Sandpiper Bay Homeowners
Association:
·
Investigated reported roof leak on the 2nd
story roof at 3181 Sandpiper North Drive. Found no issues with roof that would
cause this leak. Called the property manager and discussed
Ø
Cleaned all gutters on this building while on roof
Monday – March 27th,
2017 – Did the following work:
·
Made
trash pick up and picked up limbs through out the complex
Ø
Took
truck load of scrap to dumps
Thursday – March 30th,
2017 – Did the following work:
·
Dropped
off bag grass seed at 3090 South
·
Looked at
report of water getting into garage at 9462 East
Ø
Order
materials top make repairs tomorrow
·
9536 East
Ø
Investigated
siding leak at rear of this unit. Talked to homeowner about shutting off power
to the outside plug in box on the porch so the box and siding can be removed
Friday – March 31st,
2017 – Did the following work:
·
9562 East
Drive
Ø
Dug up 4”
corrugated drainage pipe connected to the garage downspout.
Ø
Installed
new pipe and drain box
Tuesday – April 4th,
2017 – Did the following work:
·
9478 East
Drive
Ø
Replaced
siding and trim on the peak of the garage
Ø
Replaced
1x4 over lower front roof
·
9492 East
Ø
Completely
rebuilt one of the bay windows at the rear of this unit
·
Took a
truck load of debris to Rays trash
Wednesday – April 5th,
2017 – Did the following work;
·
Picked up
“6” pcs 1x6 and “12” pcs 1x4 smart trim at Reese supply
Ø
Picked up
paint at Sherwin Williams
·
Transported
materials to Sandpiper and painted this lumber in prep to use at a later date.
·
9536 East
Ø
Removed a
rotted section of siding under the electric boxes on the back of this unit and
replaced.
-
Required
the removal cable wiring and electrical boxes to accomplish this repair.
·
Finished
out the load of scrap on the truck with limbs through out the complex and took
to Rays trash.
Friday – April 14th,
2017 – Did the following work:
·
Building
#12 – 9552 East
Ø
Painted
the new garage door
·
Pool
house
Ø
Took
inventory of materials on hand
Ø
Sprayed
weeds around the pool fence
Ø
Trimmed
the shrubs
·
Entrance
Ø
Picked up
trash at the entrance and main road
Ø
Hand
weeded and sprayed the front entrance plant beds
·
Picked up
trash and sprayed weeds in cracks through out the complex
·
3132
South Drive
Ø
Sprayed
weeds by deck
Ø
Trimmed
shrubs along the common walk
Wednesday – April 19th,
2017 – Did the following work:
·
Looked at
tree removed by Roy Wolfe
·
Looked at
rear decks that homeowners reported for repairs at 9540 and 9544 East Drive.
Ø
Both need
minor hand rail repairs
Ø
Made list
of needed repairs and material required. These will be addressed in the future
·
3132
South
Ø
Investigated
leaning fence and weeds reported by homeowner
Ø
Fence
needs minor repairs that will be addressed in the next couple of weeks
·
9478 East
Drive
Ø
Replaced
“2” pcs siding on the upper side of the fireplace chase
Ø
Trimmed
out with new trim and calked
Ø
Replaced
damaged face of upper bay window
·
Filled up
remainder of truck with limbs that the grass cutting crew had piled along the
curbs and took a truck load of debris to Rays trash
Thursday – April 20th,
2017 – Did the following work:
·
Picked up
24pcs of 1x4 Smart Trim – 16ft long from Reese
·
Picked up
“4” gal of paint from Sherwin Williams
·
Transported
to complex and painted in prep to use later
·
Also
loaded up the scrap generated by the roofing crew from the high chimney repairs
at 9466 East Drive to haul away.
·
Larry
assisted roofing crew with the high siding on the chimney at 9466 East
Ø
Looked at
roof leak with roofing crew at 3152 South
-
Stopped
at Reese to get cost on new skylight and will talk to board about its
replacement
Ø
Also
ordered additional siding and plywood at Menards for pick up on Friday for
future repairs.
Friday – April 21st,
2017 – Did the following work:
·
Picked up
the following materials at Menards, transported to the complex and stored in
the pool house
Ø
12 sheets
of T1-11 12” OC siding
Ø
6 sheets
of ½” CDX Plywood
Ø
Box roll
nails for the siding nail guns
·
9478 East
Drive
Ø
Took up a
deck board and outside hand rails on the upper deck to get to the patio door
repairs
Ø
Removed
the rotted siding across the bottom of the patio door and cut siding next to
the patio door and chimney
Ø
Removed
related 1x4 trim
Ø
Installed
drip caps, ripped and installed 1x12 under the patio door
Ø
Trimmed
out and caulked
Ø
Installed
new deck board and reinstalled the hand rail
Ø
Transported
load of scrap from this repair and the chimney the roof crew was working on at
9514 East Drive to Rays trash
·
Sprayed
the weeds growing up along the back all the East Drive buildings
April 20th, 2017
3152 Sandpiper South Dive
·
Investigated roof leak at this address,
·
Found skylight that needs replaced, made temporary
repairs and got numbers and measurements on skylight for manager
·
Note: The chimney cap also needs replaced
April 20th, 2017
·
9466 East Drive
Ø
Removed rotted siding from the 2nd level face
and long with related trim
Ø
Also removed rotted sheeting behind the siding
Ø
Installed new sheeting, siding and trim
Ø
Trimmed out siding overlaps and caulked
April 21st, 2017
·
9514 East Drive
·
Removed rotted siding from the 3rd level face
and roof siding of chimney
·
Replaced rotted sheeting
·
Installed 3 pcs siding and related trim
·
Covered siding joints on chimney, trimmed out roof level
chimney and caulked
Wednesday – April 26th,
2017 – Did the following work:
·
9540
& 9544 East Drive
Ø
Investigated
report the front post lamps were not coming on
Ø
Test both
lamps, removed tops and found not power to post
Ø
Left not
for homeowners to turn on switch or reset the GFIs
·
9540 East
Ø
Made list
of materials needed to replaced the hand rails
Ø
Stopped
at Menards and ordered the materials to make repairs next week. And siding to
be picked up and painted tomorrow.
Thursday – April 27th,
2017 – Did the following work:
·
Picked up
“12” pcs of siding at Menards and drip cap
·
Picked up
paint at Sherwin Williams
·
Painted
the siding in prep for use next week
Wednesday – May 3rd,
2017 – Did the following work:
·
Picked up
a truck load of lumber at Menards
·
9540 East
Drive
Ø
Removed
the deck railing and part of the frame on the upper rear deck at this unit.
Ø
Repaired
the frame and new railing
·
Delivered
paint to homeowners at 9540 and 9556 East Drive
·
Sprayed
the weeds growing in the common areas through out the complex with Round up
·
Loaded up
the scrap from the deck repairs and piles of limbs through out the complex and
hauled to Rays trash
Thursday – May 4th,
2017 – Did the following work:
·
Cleared
storm drains through out the complex
·
Building
#14 – Closed window at the rear of this unit on the upper deck
·
Picked up
the remainder of piles on limbs left by the grass cutting crew
Monday – May 8th,
2017 – Did the following work:
·
Picked up
soil and seed at Menards
·
3186
South Drive
Ø
Soil and
seeded yard with no grass and filled with roots
·
9560 East
Drive
Ø
Used up
the remainder of soil and seed in a bare area behind this unit
·
Picked up
trash across the front of the complex
·
Removed
limb out of tree at 2512 North
Tuesday – May 9th,
2017 – Did the following work:
·
3181
North Drive
Ø
Investigated
roof leak at this unit
Ø
Got up on
2nd story roof, took pictures and talked to homeowners
Ø
Order materials
at Menards
Ø
Gave work
order to Roof Company
Thursday – May 10th,
2017 – Did the following work:
·
Picked up
paint at Sherwin Williams
·
3132
South
Ø
Delivered
paint
·
3160
South
Ø
Delivered
paint and measured wood to be replaced later
·
3231
North
Ø
Investigated
repairs on garage door and back door frames
Ø
Took
measurements and list of materials needed
·
3185
North
Ø
Painted
trim around two back windows and door
Friday – May 12th,
2017 – Did the following work:
·
Loaded a
large pile of limbs piled up between buildings 13 & 14
·
Picked up
piles of limbs through out the complex piled up by the grass cutting crew and
homeowners
·
Cleared
storm drains
·
Took a
truck load of limbs and debris to Rays trash
Wednesday – May 17th,
2017 – Did the following work:
·
3090
South Drive
Ø
Removed 2
pcs of rotted siding over the front roof level along with rotted trim around 2
windows and along the roof level.
Ø
Installed
new siding and trim
Ø
Caulked
and touched up the paint
·
Removed
rotted 1x6 along the roof peak
Ø
Installed
new trim, caulked and touched up the paint
·
Moved the
lumber and trim from under the pool deck canopy and stored in prep for pool to
be opened
·
Loaded up
all scrap from the pool storage
·
Loaded up
scrap from 3090 South Drive
·
Took
truck load of scrap to dumps
·
Painted
cedar slats in prep for use later
·
Took
truck load of scrap to Rays trash
Thursday – May 18th,
2017 – Did the following work:
·
3132
South Drive
Ø
Removed
rotted slats on fence and replaced
Ø
Painted
board on balcony
Ø
Cleaned
gutters
Ø
Investigated
leak and caulked chimney
·
9514 East
Drive
Ø
Looked at
soffit (Needs replaced
Friday – May 19th,
2017 – Did the following work:
·
Spray
weeds in cracks in streets and drives through out the complex
·
Made a
good trash pickup
Monday – May 22nd,
2017 – Did the following work:
·
3208 South
Drive
Ø
Looked at
gutter that was falling down on the back of the garage
Ø
Removed
gutter, soffit and gutter face board
Ø
Reinstalled
soffit, fascia and gutter properly
·
3235
North and 3091 North
Ø
Turned on
water in puts
May 24th, 2017
3181 Sandpiper North Dive
·
Picked up shingles, plywood, membrane and flashing at
Menards
·
Removed trim on chimney, took up shingles on the back
corner of the chimney.
·
Installed ice & water membrane and rapped up on
chimney, flashed, reinstalled trim and caulked
·
Cleaned gutters
Hauled away debris
Thursday – May 25th,
2017 – Did the following work:
·
Cleaned
gutters and downspouts on North, East and part of South Drives
Friday – May 26th,
2017 – Did the following work:
·
Looked at
Drier vent problem at 9540 North
·
3208
South
Ø
Investigated
leaks at this unit
Ø
Went
inside and looked at stains
Ø
Got on
deck and roof to look at problems
Ø
Cleaned
front gutter and downspout
·
Checked
on pool prep for opening day
Tuesday – May 30th,
2017 – Did the following work:
·
Posted
pool permit, repaired garden hose for pool workers and made sure the phone was
working.
·
Talked to
Kevin Hill about his drier vent and looked at his repair
·
Sprayed
weeds at the entrance to the complex and in street cracks
Wednesday – May 31st,
2017 – Did the following work:
·
Cut up
large fallen limb from tree at Basketball court
·
Loaded as
much of the debris as possible on the truck and transported to Rays trash for
disposal.
Note:
There is at least 3 truck loads left
Thursday – June 1st,
2017 – Did the following work:
·
Picked up
paint that had been ordered at Sherwin Williams
·
3160
South Drive
Ø
Dropped
off 2 gal light brown and 1 gal dark brown to homeowner
·
3132
South Drive
Ø
Dropped
off 2 gal light brown to homeowner
·
Continued
cleaning gutters on south drive
Tuesday – June 6th,
2017 – Did the following work:
·
Finished
cleaning gutter and downspouts on South Drive
·
Cleaned
gutters and downspouts on West Drive
·
Sprayed
weeds growing in cracks and overgrown plant beds
·
Picked up
piles of limbs through out the complex
·
Picked up
signs, drilled signs and attached to posts
·
Put in
areas indicated by board around lake
Monday – June 12th,
2017 – Did the following work:
·
Picked up
paint and paint supplies at Sherwin Williams
·
Painted
the new wood on the repaired decks at 9536 and 9540 Sandpiper East Drive.
Thursday – June 15th,
2017 – Did the following work:
·
3208
Sandpiper South Drive
Ø
Made the
following repairs to alleviate a leak
into the living room and bedroom.
-
Removed
the end deck railing, deck floor plank, 3 pcs siding and related trim on the 2nd
level deck.
-
Installed
1x10 under across the face of the deck and under the upper patio door.
-
Installed
drip cap and “3” pcs of new siding
-
Installed
new trim around the patio door, across the top of soffit and on the corner.
-
Reinstalled
the deck railing and floor plank
-
Caulked
and touched up the paint
-
Sealed
the trim and siding on the back side of the chimney above the roof level
-
Took
scrap to Rays trash along with limbs picked up through out the complex
Monday – June 19th,
2017 – Did the following work:
·
9462 East
Ø
Repaired
split rear drain line
Wednesday – June 21st,
2017 – Did the following work:
·
3151
North
Ø
Investigated
problem with upper deck
Ø
Used
screws to secure to wall
·
3160
South Drive
Ø
Replaced
rotted work on “2” rear bay windows
Ø
Completely
rebuilt sides and face of these windows boxes, caulked and painted
·
3170
South Drive
Ø
Replaced
the rotted face of the rear bay window
Thursday – June 22nd,
2017 – Did the following work:
·
Picked
siding and trim at Menards
·
Picked up
paint and paint supplies at Sherwin Williams
·
Set up
saw horses and painted the following:
Ø
12 sheets
T1-11 siding
Ø
4 pcs. –
1x12” x 16ft smart trim
Ø
8 pcs –
1x4” x 16ft smart trim
Ø
6 pcs –
1x6” x 16ft smart trim
·
Loaded up
scrap from the repair crew and took to Ray trash
·
9480 East
Drive – Did the following work:
Ø
Replaced
the siding and trim on the right side of the chimney
Ø
Rebuilt
rear North West corner back corner bay window
-
Painted 2
rear bay windows
Ø
Replaced
1x12 belt board between 9480 & 9478 East
Ø
Replaced
the face of the bay window next to the chimney
Ø
Caulked
and painted the new lumber
Ø
Inspected
and made list of addresses of chimney caps on East Drive that still need
replaced
Monday – June 26th,
2017 – Did the following work:
·
Started
cutting down the volunteer trees and saplings that had overgrown the large
evergreens across the front of the complex.
Ø
Also
prayed the large thistles growing in the same area
·
Building
#3
Ø
Remove
growth around the base of the tree at 3238 North
Ø
Removed
saplings and sprayed weeds around rear of building
Note: Ended up with 4 very large
piles of debris from this work
·
Loaded up
truck load of debris and proceed to Rays trash
Tuesday – June 27th,
2017 – Did the following work;
·
Removed
saplings and trees growing up in the fence line along the west side of the
Property.
Ø
Cut on
both sides of fence
·
Cleaned
up area at the SW corner of the property between the fence and street
·
Trimmed
the shrubs and cleaned up saplings around the pool house
·
Painted
the remaining lumber that was not painted last week at the pool house storage
and let dry while making first trip to Rays trash
·
Come back
and loaded the 2nd load of debris on the truck, put up lumber and
delivered doggy bags after filling stations as best we could without a key.
Wednesday – June 28th,
2017 – Did the following work:
·
Started
clear saplings from the fence on the East Side of the complex
·
Loaded up
the last load of trimmings from the first of the week plus loaded up a pile a
homeowner left on North Drive
·
Took
truck load to Rays trash
Thursday – June 29th,
2017 – Did the following work:
·
Looked at
“3” post lamps that were reported out
Ø
3182
South Drive
-
Replaced
bulb and left note
Ø
3094
South
-
Disconnect
wires from light at garage
-
Tested
with meter and found wires or light is shorted to ground
-
Left
disconnected and left note for homeowner that we will return next week to dig
up the cable
Ø
9544 East
-
Replaced
bulb and electric eye and left note for homeowner
Wednesday – July 5th,
2017 – Did the following work:
·
3186
South Drive
Ø
Raised
shade on low hanging tree over the drive at this unit
·
Finished
clearing fence row on the east drive
·
Raised
shade on trees on the fence line and in front of units on this street
·
Took
truck load of debris to Rays trash
·
3094
South Drive
Ø
Dug up
pole lamp cable and found broken wire
Ø
Spliced
in a new section of wire
·
9544 East
Ø
Dug up
cable starting at the light from the light to the sidewalk.
Ø
Determined
the wire was broken of damaged under the walk
Ø
Spliced
on a roll of new wire at the post and will send crew back to dig in the new
wire along the drive, under the walk and across the court yard to the porch
tomorrow
Thursday – July 6th,
2017 – Did the following work:
·
Picked up
top soil, white rock and seed at Menards
·
9544 East
Drive
Ø
Dug in
cable from the pole lamp along the drive, under the walk and across the
courtyard to the porch.
Ø
Cover up
wire with top soil and seed
Ø
Left end
out so Larry can connect to the homeowners service later
Note: This was very difficult
digging because of the large rooted from the tree that was removed from the
areas last year. Had to use chain saw and digging bar to remove the roots.
·
Removed
weed from “3” dock areas and filled in the boat landing areas with fresh white
rock
Friday – July 7th,
2017 – Did the following work:
·
3094
South Drive
Ø
Installed
replacement lamp post fixture
·
9544 East
Drive
Ø
Waited on
homeowner to connect wire and she did not show up. We left note and rescheduled
Monday – July 10th,
2017 – Did the following work:
·
3186
South
Ø
Cleaned
gutters and downspouts
·
9462 East
Ø
Investigated
downspout problem
Ø
Found the
corrugated pipe below ground filled with roots
-
Disconnected
as a temporary fix and will return later to dig up and replace.
·
Cleared
storm drains and picked up limbs from heavy rain and winds over the weekend.
(lots of limbs)
Wednesday – July 12th,
2017 – Did the following work:
·
9474 East
Drive
Ø
Removed
siding on the 1st and 2nd level right side of chimney and
related trim
-
Replaced
siding and trim
Ø
Replaced
the 1x10 belt board between units
Ø
Installed
1x6 trim boards to cover drip caps on all 3 levels of chimney on all sides
Ø
Caulked
with Geocel in prep for painting
Ø
Took
truck load of scrap from todays work and limb pick up Monday to Rays trash
·
Picked up
drainage supplies at Menards
·
9462 East
Drive
Ø
Dug up
root filled corrugated drain pipe, installed new drain pipe and drain box.
Thursday – July 13th,
2017 – Did the following work:
·
Picked up
large fallen limb on 3125 North and hauled away
Friday – July 14th.
2017 – Did the following work:
·
3094
South Drive
Ø
Picked up
3 sheets of ½ OSB sheeting and Geocel from Reese
Ø
Removed
lower level siding on front and both sides
Ø
Removed
the rotted sheeting behind the siding
Ø
Removed 2
pcs rotted 2x4 supports on the chimney chase framing, installed new treated
ones along with additional 2x4 blocking
Ø
Cut and
installed new sheeting and siding on all 3 sides of chimney
Ø
Trimmed
out corners with 1x4 smart trim and covered all 3 levels of drip cap with 1x6
smart trim
Ø
Made a
temporary repair on the upper level patio door side of chimney and will return
later for make permanent repairs. Note: Upper door needs replaced
Ø
Replaced
one section of brick mold, 2 pcs siding and trim over the lower patio door.
(Note: The patio door needs replaced)
Ø
Caulked
all new lumber with Geocel in prep for painting
Ø
Hauled
truck load of scrap to Rays trash
·
Waited on
homeowner at 9544 East Drive to make connections on light fixture service.
Homeowner did not show and left note.
·
3182
South
Ø
Investigated
no power to front light fixture
Ø
Found not
power coming from home after removing light fixture and the box cover on the
garage.
Ø
Met
homeowner and looked inside for possible kicked out breaker or GFI.
Ø
Also
removed switch cover at front door light switch and checked for power.
Ø
Informed
homeowner that she would need to get an electrician to check for the interior
problem further.
Ø
Also
looked at some siding and trim problems on the chimney and called off to put in
work order for later repairs
Monday – July 17th,
2017 – Did the following work:
·
Picked up
trim at Menards
Ø
Set up
saw horses and painted in prep for work.
·
3094
Sandpiper South Drive
Ø
Replaced
the rotted siding and 1st and 2nd level of the chimney
and related trim
Ø
9474
& 9470 South drive
-
Replaced
belt board
Ø
Cleaned
back gutter
Ø
Painted
trim in prep for use later
Ø
Proceeded
to Rays and empty trash
·
3219 North
Drive
Ø
Met
homeowner and investigated the chimney
Ø
Caulked
around the chimney and where roof levels change
Wednesday – July 19th,
2017 – Did the following work:
·
3266
North Drive
Ø
Replaced
siding on 2nd and 3rd level of back of the chimney
Ø
Replaced
1x4 edge trim and covered drip edge with 1x6
·
9466
& 9470 East Drive
Ø
Paint
backs of chimney
·
Took
truck load of trash to the dumps
·
Touched
up paint on siding installed earlier in the week.
·
Removed
large broken limb from tree at the corner of North and East Drives
Thursday – July 20th,
2017 – Did the following work:
·
Picked up
siding and trim at Menards
·
Picked up
paint at Sherwin Williams
·
Painted
siding and trim in prep for future work
·
Painted
the trim around the upper window at 9544 East Drive
·
Sprayed
weeds at the entrance
·
Suckered
trees and sprayed around the pool area
Friday – July 21st,
2017 – Did the following work:
·
9544 East
Drive
Ø
Met
homeowner at the unit to open garage
Ø
Drilled
hole in wall, ran conduit, boxes and connect power to switch in the garage
Tuesday – July 25th,
2017 – Did the following work:
·
Cut
saplings out along lake by pool
·
Hand
weeded and sprayed front entrance
·
Picked up
trash and limbs through out the complex
Monday – July 31st,
2017 – Did the following work:
·
Made a
good trash pickup through out the complex
·
Cleaned
up saplings, small trees and sprayed the thistles in the clump of trees across
the drive from building #13 on North drive
·
Took a
full truck load of debris to the dumps
Tuesday – August 1st,
2017 – Did the following work:
·
Picked up
additional lumber at Menards
·
3094
Sandpiper South Drive
Ø
Took down
both ends of upper railing.
Ø
Removed
rotted siding on the left side 2nd & 3 level of chimney
Ø
Removed
siding and trim around the patio door
Ø
Took up
one section of deck
Ø
Installed
1x10 and step flashing under the patio door
Ø
Replaced
rotted plywood backing on chimney
Ø
Replaced
siding removed above and trimmed out
Ø
Caulked
in prep for painting
Ø
Installed
replacement light fixture
Ø
Took a
truck load of scrap to Rays trash
Wednesday – August 2nd,
2017 – Did the following work:
·
Sprayed
all evergreen along fences on South and East Drive with “Sevin” insect spray to
treat for bag work infestation of these trees.
·
Trimmed
the shrubs at the pool
·
Hand
weeded and sprayed the front entrance
·
Blow off
the tree droppings from the pool deck and sprayed weeds
·
Sprayed
the Thistles along the main road growing up in the large evergreens with Round
up
Friday – August 11th,
2017 – Did the following work:
·
Cleaned
gutters and downspouts on two units on South drive
·
Made good
trash and stick pick up
Thursday – August 17th,
2017 – Did the following work:
·
Made a
good trash pick up across the front of the complex
·
Sprayed
grass and weeds growing up around decks and in cracks in the see walls on the
full length of south drive
Friday – August 18th,
2017 – Did the following work:
·
Picked up
truck load of bag of cement at Menards
·
Proceeded
to complex and filled cracks and washed out areas around the sea walls on the south
drive with dry concrete mix
·
Picked up
limbs through out the complex
Monday – August 21st,
2017 – Did the following work:
·
3132
South Sandpiper South Drive
Ø
Met
homeowner to look at his maintenance Issue
·
3228
South
Ø
Removed
rotted siding and trim from 1st and 2nd levels on the
front and right side of this chimney
Ø
Replaced
the rotted 2x4 on the interior frame
Ø
Installed
“6” pcs of siding nd related trim
Ø
Caulked
Ø
Hauled a
truck load of debris to Rays trash
·
9511 West
Drive
Ø
Trimmed
limbs back from house
Ø
Picked up
limbs through out the complex
Ø
Sprayed
tall weeds growing up along back of units on South drive
Tuesday – August 22nd,
2017 – Did the following work:
·
Sprayed
evergreens again along the South drive for Bag Worms
·
9522 –
9536 East Drive
Ø
Suckered
and raised shade n the tree between these units
·
3113
North
Ø
Raised
shade on the clump of trees across the street from this unit on the main road
·
3207 –
3211 North Drive
Ø
Raised
shade on the cotton wood trees behind these units
·
9531 West
drive
Ø
Removed
saplings and sprayed behind the units in this area
·
9511 West
Ø
Removed
saplings
·
Took very
full truck load of debris to Rays trash
·
Picked up
paint at Sherwin Williams
Ø
3174
South Drive
-
Delivered
paint to homeowners
-
Refastened
loose trim at peak over garage
-
Replaced
damaged slats on fence
-
Refastened
and cleaned gutter downspout
-
Looked at
front soffit and door brick to determine required repair
Ø
3125
North Drive
-
Cleaned
gutter and downspouts
Ø
3139
North Drive
-
Cleaned
gutter and downspouts and cleared debris from roof
Monday – August 28th,
2017 – Did the following work:
·
Made a
good trash and limb pick up through out the complex
Wednesday – August 30th,
2017 – Did the following work:
·
Picked up
materials at Menards
·
Picked up
toilet left next to the street
·
3182 South
Drive
Ø
Installed
drainage pipe at rear of unit to get water from the downspout away from the
deck
Ø
Use
concrete and soil to fill the hole
Friday – Sept. 1st,
2017 – did the following work:
·
9511 West
Drive
Ø
Sprayed
poison ivy growing up at the rear of this unit
·
Sprayed
large amount of thistles growing around the large evergreens at the front of
the complex
·
Sprayed
weeds growing in cracks and along fences through out the complex
Tuesday – Sept. 5th,
2017 – Did the following work:
·
Made a
good trash pickup through out the complex
·
Investigated
water running from curb at 9482 East
Ø
Called
the water company
·
Cut up a
large fallen tree limb across the drive and loaded on the truck
Ø
Hauled to
Rays
Thursday – Sept. 7th,
2017 – Did the following work:
·
Picked up
lumber and materials at Menards
·
3182
South Drive
Ø
Replaced
section of rotted soffit over front door
Ø
Replaced
rotted brick mold on both side of front door
Ø
Replaced
pie shaped section of trim on upper soffit
Ø
Caulked
and painted the new lumber
Ø
Cleaned
upper and lower gutters
Ø
Back
screwed and secured brackets on gutters across the front of the upper level
·
Made walk
through on South and East drive to make list of work for next couple of weeks
Friday – September 8th,
2017 – Did the following work:
·
Picked up
trim at Menards and paint at Sherwin Williams
·
Transported
to complex, pained trim and stored
Thursday – Sept. 14th,
2017 – Did the following work:
·
Picked up
screen at ACE Hardware, took to 3132 S and reinstalled. No Charge
·
Made a
good trash pick up through out the complex and entrance
Friday – September 15th,
2017 – Did the following work:
·
3105
Sandpiper North Drive
Ø
Removed
rotted brick mold around the back patio door, cut and installed new. Caulked as
needed
·
Moved the
lumber stored on the outside of the pool house to the area under the canopy
where it will be stored for use for the winter months
Ø
Inventoried
the lumber on hand
Monday – Sept. 18th,
2017 – Did the following work:
·
3231
North Drive
Ø
Replaced
rotted brick mold around the back door
·
Made
trash pick up along main road and entrance
Tuesday – Sept. 19th,
2017 – Did the following work:
·
Replaced
the bulbs on both entrance lights
·
3186
South Drive
Ø
Cleaned
front gutters on whole building and removed debris from ground
Ø
Raised
the shade on trees in the front
·
Surveyed
complex and picked up limbs through out
·
Made trip
to Rays trash with truck load of debris
Friday – September 22nd,
2017 – Did the following work:
·
3106 –
3110 South Drive
Ø
Trimmed
trees and raised shade
·
Touched
up paint on light posts at:
Ø
3106,
3090, 3094, 3110, 3114, 3122 South
Monday – Sept. 25th,
2017 – Did the following work:
·
Walked
the perimeter of the lake
Ø
Removed
saplings along bank
Ø
Sprayed
round up on grass and weeds growing in the rocked area
Ø
Took
truck load of debris to Rays trash
Note: Grass cutting crew was contacted and they
will weed whip the tall grass left.
·
Looked at
section of leaning fence on West Drive and secured the fence to the post as
needed
·
Continued
spraying light poles and street sign poles through out the complex
·
Made good
trash pick up
·
Delivered
paint to homeowner